WS Construction Solutions is an Adelaide based private company, providing a wide range of civil, engineering and infrastructure concreting.

Our reputation for high quality work in the industry has seen us land jobs with some of South Australia's biggest companies over the past few years.

We have the knowledge and experience to cater for everything from the smallest of jobs to large-scale projects.

Home: About

PROJECT PORTFOLIO

APEX PARK DUCK POND

CLIENT - Camco Pty Ltd
LOCATION - Burbridge Road

Our client for the Apex Park Duck Pond project was interested in creating an economically and environmentally sustainable space. We worked with the client to produce and attain a finished product catered to their specific requirements on time.

LINCOLN GAP BATTERY FARM UPGRADE

CLIENT - Beltrame Civil
LOCATION - Lincoln Gap

WS Construction Solutions were contracted by Beltrame Civil for this major project which included:  construction of 120m of concrete cable trench for HV conduit, construction of 55 concrete footings of various types, including 3 enclosure slabs, 6 inverter slabs & 6 transformer slabs.

NORTHFIELD SUBSTATION ROAD UPGRADE

CLIENT - Beltrame Civil
LOCATION - Northfield

WS Constructions were engaged by Beltrame Civil to construct heavy duty kerbing throughout Northfield Substation. The works including 450m of mountable kerb, medium kerb, aprons and spoon drains at 350mm thick. All kerbing construction as completed on time by the required finish date.

APEX PARK BUILDING PROJECT

CLIENT- Camco Pty Ltd
LOCATION- Burbridge Road

Associated with Camco this particular project was completed as part of the Apex Park Upgrade. It’s the perfect example of my dedication to deliver a quality product, installing exposed aggregate foot bath around the building, with 25 meters of exposed bleachers finishing off with the set of stairs. 

HAY DOWN ROAD BUS STOP UPGRADE

CLIENT- Remo Contractors
LOCATION- Haydown Road, Elizabeth South

WS  Construction solutions were engaged by Remo contractors to construct a Bus Stop Upgrade. The project was a key element to the Lyall Macewin Hospital for transport to and from for both patients and public. The project scope included a 220m2 of blinding layer, constructing 70m of kerb and Gutter, 600mm spoon drain at 350mm in-depth, concrete apron at 250mm in depth of 200m2 of concrete with Broome finish .

YADNARIE SUBSTATION ROAD & DRAINAGE UPGRADE

CLIENT- Beltrame Civil
LOCATION- Yadranie 

WS Construction Solutions were contracted by Beltrame Civil to construct new heavy duty Kerbing paving on both sides of the sub surface. The project scope included construction of 450m of heavy duty concrete kerbing. This project was completed within 4 weeks from start to finish 

POOL CONCRETE

CLIENT - RESIDENTIAL
LOCATION - HOME UPGRADE

Despite some unforeseen difficulties, this particular project was completed on time and within budget. It’s the perfect example of my dedication to deliver a quality product, no matter what complications arise, in order to ensure full client satisfaction.

HOUSE FOOTINGS

CLIENT - RESIDENTIAL

If you’re looking for a certified Concrete Contractor to manage a really complex job, then this project is a true testament to my abilities to deliver exemplary results under time and financial pressure.

Home: Projects

ACCREDITATIONS

TRAFFIC MANAGEMENT

Control traffic with slow-stop bat
Implement traffic management plan

LICENSES & ACCREDITATIONS

LR - HC License

Skid Steer

Excavator 

Front End Loader

Dozer

Articulated Dumper

Roller

Grader

White Card

APA Accreditation

Confined Space

FIRST AID

Senior first Aid
Provide First Aid
Provide Cardiopulmonary Resuscitation

Home: Files
bottom of page